Town Marina Project

Project StatusCurrent Docks

The Master Plan for Town Docks began in January of 2017 and was approved by the Town Council on April 10, 2018.  The final dock design includes 84 slips (7 of which are marginal side ties) ranging from 60 to 294 ft. divided between three docks - Brazilian, Australian, and Peruvian.  The new Palm Way dock will be 250 ft. (500 ft. of marginal side).

The marina will feature concrete floating docks, upgraded electrical service with enhanced wifi, security gates access, potable water, and  fire suppression systems.

20200217_Docks_Perspective_revised 2-17

On February 11, 2020, Town Council approved $31 million in financing and approved the construction contract on March 10, 2020. Construction commenced on May 1, 2020. 


TOWN DOCKS PROJECT FACT SHEET- February 10, 2020

All other documents may be accessed at the links to the left.


Questions or comments regarding the actual construction of the marina project can be sent to townmarina@burkhardtconstruction.com.  


For questions related to the new marina or slip lease information, please contact dockmaster@townofpalmbeach.com or by calling 561-838-5463.